Case study 2 February 2020

Mitie HQ, The Shard – Workplace Design and Relocation

The challenge

Mitie as a client

Mitie’s strategic and operational staff were dispersed across three London office locations. To operate as “One Mitie” it was decided to consolidate into a single location, reducing square footage whilst improving utilisation and building user satisfaction. There was an additional requirement to showcase Mitie’s technology capability through the Connected Workspace.

Solution

The project included:

  • Staff travel patterns analysis to identifying suitable locations
  • Design and delivery of a Mitie Workplace Strategy
  • Design and agreement of the design floorplate
  • Complete fit-out
  • Implementation of workplace change management.

The final recommended solution was designed to meet Mitie’s current and future operational needs.

Outcome

Mitie moved 600 people into the iconic “Shard” building supporting fully flexible working featuring a workspace with innovative design, Connected Workspace integration and industry leading audio-visual capabilities.

The use of Agile Workplace principles and Wellbeing best practices, during the design and build programme, ensured a smooth relocation and business continuity.

Proactive programme management ensured delivery on time, to cost and to the highest standards.

Key facts

  • Cat B fit-out
  • Relocation of 600 people
  • Fully flexible working introduced
  • Connected Workspace integration
  • Innovative design with industry leading audio visual

Read next

See Resource Archive